Log Home Pictures from 2002, Part 1 of 3

There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 1 of 3. Go to page 1 2 3 next prev

Other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024


The major projects for 2002 were to finish building and staining the porch log structure, to chink as much of the outside of the building as possible, and to begin building the porch deck.

In this composite picture taken from the cliff behind the building, you can see the first three deck joists in place. You can also see Nason Ridge in the background above the building, and, if you scroll over, you can see the northeast wall of the building. 1/17/02


Eight porch joists are in place here. 2/20/02


Some more excavation was required before I could place joists on this end of the porch. As you can see, the rocks and dirt were higher than the tops of the two porch beams. 2/20/02


Nearly all the deck joists are in place in this picture. 3/28/02


Time to stain the entire porch log structure. Here is the Grid F purlin and the scaffolding I used to reach it. You can see a rope hanging from one of two anchor hooks that are visible under the end of the purlin. 4/17/02



There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 1 of 3. Go to page 1 2 3 next prev



Pictures from other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Go To Home Page

©2003-2024 Paul R. Martin, All rights reserved.