Log Home Pictures from 2004, Part 2 of 2

There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 2 of 2. Go to page 1 2 next prev

Other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024


The major projects for 2004 were to get a good start on varnishing the interior walls and to get a start on the water line running from the springbox to the cabin.


This is the new plumbing at the springbox. The picture was taken on 6/9/04.


Here you see the copper water line leaving the springbox. It is curved to fit in the bottom of the channel so that it remains submerged. That way it won't freeze. The picture was taken on 6/9/04.


The pipe follows an underground stream bed and comes out from under this tree. I succeeded in getting that pipe through there on 5/19/04.


This is a picture of the three-tier scaffold tower I set up in order to varnish the ridgepole above the living room. The picture was taken on 6/9/04.


Here you see the scaffold and the ridgepole. This picture was taken on 6/9/04.


Looking down from the high scaffold. This picture was taken on 6/9/04.


Here is Andrew busy varnishing part of the kitchen wall on 12/23/04.


Here is Paul varnishing part of the main loft beam on 12/23/04.


This is the dining room wall and the kitchen wall from left to right. The picture was taken on 12/16/04.


This is looking out one of the big living room windows. The picture was taken on 12/16/04.



There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 2 of 2. Go to page 1 2 next prev



Pictures from other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Go To Home Page

©2004-2024 Paul R. Martin, All rights reserved.