The first two pairs of rafters are in place.


By September, all rafters are installed. Not much time left to nail on the OSB sheathing.


The rafters changed the look of the building and provided some interesting lighting effects.


This shows the start of the walkway to the roof. The rails are retired crane mast and booms. The deck is OSB.


Looking down the completed walkway from the commander's chair. The first course of OSB is nailed on the roof. The pickup and trailer can be seen at the bottom of the walkway.


Ellen nailing down OSB.



There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . .This is Page 3 of 4. Go to page
1 2 3 4 next prev



Pictures from other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Go To Home Page

©2003-2024 Paul R. Martin, All rights reserved.