Log Home Pictures from 2003, Part 4 of 4

There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . .This is Page 4 of 4. Go to page 1 2 3 4 next prev

Other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024


These pictures show the recent projects of finishing the chinking on the outside of the building, and installing windows.


This is the front of the building completely chinked.


This is a close-up of the chinking on the northwest wall.


The northwest wall after it is all chinked. The scaffolding is still in place for the bottom of it, and the last seam is not yet dry.


This is the utility trench in the upper roadway. Two water pipes and two electrical conduits are waiting to be covered up. You can see the new living room window that is installed at this point.


This is the sling used to lift the windows. You can see the clips and small C-clamps at the top corners.


This is the rigging used to lift the big windows. All the details of this rigging are described here.



There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . .This is Page 4 of 4. Go to page 1 2 3 4 next prev



Pictures from other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Go To Home Page

©2003-2024 Paul R. Martin, All rights reserved.