Log Home Pictures from 2020, Part 2 of 3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 2 of 3. Go to page 1 2 3 next prev

Other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024


6/11/20 Here is the "impossible table" I made as a fun spare-time project. I got the idea from YouTube, had the materials, the tools, and the time so I had fun doing it.


6/11/20 Here is the impossible table situated in its more-or-less final location. It will be a good conversation piece sitting in the corner like that.


7/24/20 The workmen have arrived to install the floor insulation.


7/24/20 The workmen are installing the floor insulation.


7/23/20 This lizard was the second one I caught inside the cabin in the past couple weeks. I haven't a clue as to how they get in. I caught both of them in the box this one is on and I let them go on the front porch.


7/23/20 Here he is on the porch deck. You can judge his size by the balusters which are spaced 4 inches apart.


7/24/20 Robert and Tom are swapping the two front tires on the skidder. Here they are rolling the right tire over to temporarily lean it against the dozer blade.


7/24/20 Here they are rolling the left tire over to the right side of the skidder to mount it there.


7/29/20 The insulation in the floor.


7/30/20 The completed restraint for the water heater is bolted to the bedrock.


7/31/20 The first stones are placed in the front landing. You can see the weighted porch crane hook hanging down in the center of the picture. The three rebar S-hooks hanging from it form an effective grapple which I used to lift and manipulate some of the bigger rocks. You can also see the crane control lying on the step behind the hook.


8/3/20 I used an old patio umbrella for shade so I could do the heavy work of moving fairly big rocks around to form the "Legal Landing" for the front staircase as required by the building inspector.


8/6/20 Here is the completed "Legal Landing". The final inspection was made the next day on 8/7/20. I passed with flying colors and with compliments from the building inspector on my craftmanship, both for the landing and the water-heater restraint. This was a momentous milestone since it changed our status from being 29-year-long owners of a construction site to being brand new home-owners of an official house. Rarely has this project given me such a feeling of exhilaration as I experienced on August 7.


8/21/20 The long-awaited Certificate of Occupancy!


. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .This is Page 2 of 3. Go to page 1 2 3 next prev