Log Home Pictures from 2010, Part 2 of 5
There are multiple picture pages for this year. . . . . . . . . . . . . . . . . . . . . . . . .This is Page 2 of 5. Go to page 1 2 3 4 5 next prevOther years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
4/14/10 Craig and Wes doing their plumbing in the crawl space.
4/14/10 Wes and Craig after the plumbing job is done. Water runs in the shower now, cold water only at this point though. Hooray!!
4/14/10 The drain pipe is laid out toward the septic tank.
4/14/10 The drain pipe laid out up to the cabin.
4/15/10 Dosing pump control box recessed into log wall.
4/15/10 Conduit going down through the sill log and from there to the ground.
4/15/10 The wiring inside the control box.
4/15/10 The view from the back porch of the drain pipe route to the septic tank. Note the rocks that had to be moved out of the way. This is also the route for the accessibility ramp that might be installed permanently some day.
4/15/10 This shows the final lay of the land after the septic drain pipe was covered up.